Installing Dionex Devices
Dionex Coulochem III Detector: Interfacing the detector with an UltiMate 3000 Pump
The Coulochem III detector can be operated with the various pump models of the UltiMate 3000 series. To enable operation synchronization between the instruments, a signal cable suitable for the respective pump model is required. In addition, the appropriate settings for the respective pump model have to be configured in the Chromeleon Server Configuration.
The table below provides an overview of the pump models that can be operated with a Coulochem III detector and the cable type to be used:
Pump Model |
Required Cable Type |
Dionex Part No. |
ISO-3100SD/BM LPG 3400SD/RS/BM DGP-3600SD/RS/BM HPG-3x00SD/RS HPG-3200BX Tip: Required pump firmware version: 2.20 or later |
6-pin Mini-DIN signal cable |
6000.1004 |
LPG-3400XRS Tip: Required pump firmware version: 5.7 or later Note: For information about how to connect the detector with an UltiMate 3000 LPG-3400XRS pump, refer to the operating instructions for the pump. |
Shutdown cable |
6043.0003 |
ISO-3100A, LPG 3400A/M/AB/MB DGP-3600A/M/AB/MB HPG-3200A/M/P HPG-3400A/M Tip: Required pump firmware version: 3.05 or later |
Shutdown cable
|
6035.0004 |
For cable details and pin assignments, refer to Dionex/ESA Interface Cable.
Follow the steps described below for installing the signal cable suitable for your pump model and for configuring the pump settings in the Chromeleon Server Configuration.
To install a 6-pin Mini-DIN signal cable
The 6-pin Mini-DIN cable is required for interfacing an UltiMate 3000RS, SD, BM or BX pump with a Coulochem detector. The cable and wire connections are as follows:
Plug the 6-pin connector of the Mini-DIN cable into the Digital I/O port 1 (left port) of the pump.
To connect the DGP-3600SD/RS/BM pump, the following additional step is required:
Select port 1 if the flow to the detector is delivered by the left pump head.
OR
Select port 2 if the flow to the detector is delivered by the right pump head.
For each relay output or digital input to be used, connect the appropriate signal wire to the corresponding connectors on the I/O connection block on the rear panel of the detector:
Connect the white wire to the Cell off- connector.
Connect the brown wire to the Cell off+ connector.
After you have finished these steps, configure the pump settings in the Server Configuration.
Settings in the Chromeleon Server Configuration
When setting up the pump in the Chromeleon Server Configuration program, configure the digital inputs on the Inputs tab page and the relay outputs on the Relays tab page as follows:
ISO-3100SD, LPG 3400SD/RS/BM, HPG-3x00SD/RS and HPG-3200BX:
On the Relays tab page, clear the Pump_Relay_1 check box.
DGP-3600SD/RS/BM:
If the flow is delivered by the left pump head:
On the Relays tab page, clear the Pump_Relay_1 check box.
If the flow is delivered by the right pump head:
On the Relays tab page, clear the Pump_Relay_2 check box.
Tandem Operation
When operating an UltiMate 3000RS, SD, BM and BX pump in tandem mode two Mini-DIN signal cables are required. The cable connections and Server Configuration settings are as follows:
Plug the 6-pin connector of the first Mini-DIN cable into the Digital I/O port 1, and the second Mini-DIN cable into the Digital I/O port 2 of the pump.
On the opposite end of each cable, remove the cable end sleeves and insulation from the wires. Join the same-color wires together to form pairs of matching colored wires.
Plug each wire pair into the corresponding I/O connector of the detector as described above.
On the Inputs tab page in the Server Configuration, clear the Pump_Input_1 and Pump_Input_2 check boxes.
On the Relays tab page, clear the Pump_Relay_1 and Pump_Relay_2 check boxes.
To install a Shutdown cable
The Shutdown cable is required for interfacing all UltiMate 3000 pumps except RS, SD, BM or XRS pumps. The cable and wire connections are as follows:
Plug the 25-pin D-Sub female connector of the Shutdown cable into the corresponding port at the rear of the pump.
Connect the separate wires on the other end of the cable to the corresponding connectors on the connection block on the rear panel of the detector (wires are labeled).
ISO-3100A, LPG-3400A/M/AB/MB, HPG-3200A/M/P and HPG-3400A/M:
Connect the Cell off- wire to the Cell off- connector.
Connect the Cell off+ wire to the Cell off+ connector.
DGP-3600A/M/AB/MB:
If the flow is delivered by the left pump head:
Connect the Cell off- wire to the Cell off- connector, and the Cell off+ wire to the Cell off+ connector.
If the flow is delivered by the right pump head:
Connect the Cell off- wire to the Cell off- connector, and the Cell off+ wire to the Cell off+ connector.
After you have finished these steps, configure the pump settings in the Server Configuration.
Settings in the Chromeleon Server Configuration
When setting up the pump in the Chromeleon Server Configuration program, configure the digital inputs on the Inputs tab page and the relay outputs on the Relays tab page as follows:
ISO-3100A, LPG-3400A/M/AB/MB, HPG-3200A/M/P and HPG-3400A/M:
On the Relays tab page, select the Pump_Relay_4 check box.
Double-click Pump_Relay_4. On the Device Configuration dialog box, click the arrow next to the Function list box and select FlowZero.
DGP-3600A/M/AB/MB:
If the flow is delivered by the left pump head:
On the Relays tab page, select the Pump_Relay_2 check box.
Double-click Pump_Relay_2. On the Device Configuration dialog box, click the arrow next to the Function list box and select FlowZero.
If the flow is delivered by the right pump head:
On the Relays tab page, select the Pump_Relay_4 check box.
Double-click Pump_Relay_4. On the Device Configuration dialog box, click the arrow next to the Function list box and select FlowZero.
Tandem Operation
When operating an UltiMate 3000 pump in tandem mode, the cable connections and Server Configuration settings are as follows:
Plug the 25-pin D-Sub female connector of the Shutdown cable into the corresponding port at the rear of the pump.
On the opposite end of the cable, remove the cable end sleeves from the wires. Join the following wires together to form pairs of wires:
join Pump1 off with Pump2 off, Cell1 off- with Cell2 off-, and Cell1 off+ with Cell2 off+.
Plug each wire pair into the corresponding I/O connector of the detector as described above.
On the Relays tab page, clear the Pump_Relay_2 and Pump_Relay_4 check boxes.
Further Information
For detailed installation instructions, refer to the operating instructions for the instrument.
For information about connecting the detector with an UltiMate 3000 LPG-3400XRS pump, refer to the operating instructions for the pump.
For installation information refer to Coulochem III Electrochemical Detector: Installation.
For an overview of the different ESA devices supported by Chromeleon, refer to ESA Overview.
For an overview of the different Dionex devices, refer to Installing Dionex Devices.